Appropriation of procured funds(As of March 31, 2022)

Item Amount
Procurement amount (amount received) 9.9 billion yen
Appropriated amounts 9.9 billion yen
(breakdown) Kurokawadaira Hydro Power (Nagano Pref.) 0.1 billion yen
Ichishiro Hydro Power (Shizuoka Pref.) 0.1 billion yen
Seinaiji Hydro Power (Nagano Pref.) 1.9 billion yen
Abekawa Hydro Power (Shizuoka Pref.) 2 billion yen
Yokkaichi Biomass (Mie Pref.) 5.4 billion yen
Atsumi Onshore Wind Power (Aichi Pref.) 0.1 billion yen
Unappropriated balance Not applicable

*1 Figures less than the expressed unit are rounded down.

*2 Of the amount procured, 5.9 billion yen was allocated to the refinancing of the construction funds for the Yokkaichi Biomass Power Plant and the Seinaiji Hydroelectric Power Plant.

Environmental improvement effect

Project Installed capacity Reduction of CO2 emissions*
Kurokawadaira Hydro Power (Nagano) 0.17MW 87,791(t-CO2/y)
Ichishiro Hydro Power (Shizuoka) 0.17MW
Seinaiji Hydro Power (Nagano) 5.63MW
Abekawa Hydro Power (Shizuoka) 7.50MW
Yokkaichi Biomass (Mie) 49.00MW
Atsumi Onshore Wind Power (Aichi) 7.40MW

* Calculated by: FY2023 annual power generation volume (MWh)×CO2emission coefficient (t-CO2/MWh)
For projects included both in the first and second green bonds, their respective reduction volumes were calculated based on the percentage of the amount of funds appropriated to each.